three. Soon after rig positioning, travel the casing into the bottom. Drive steel casing to some bare minimum a depth of one m down below the bottom level to choose lateral hundreds and movements at site. The steel casing also combat challenges as a result of groundwater throughout piling.আমাদের কোম্পানিতে দক্�